Buying commercial laundry equipment is not a checkout. It is a site survey, a machine mix, an installation and then years of service. Here is the whole sequence, and what we need from you at each stage.

14 daysStocked models
30 daysIndent orders
24hService response
Own teamInstall & commission

Seven steps, no surprises

Each step ends with something you can hold: a survey, a drawing, a price, a machine, a working bay.

  1. 01

    Site survey

    We visit the site and measure what is actually there — floor area, access, power supply, water inlet and drainage. A quotation is never issued from an email description alone, because the constraints decide the machine mix.

    You provide: access to the space, and a floor plan if one exists.

  2. 02

    Machine mix & layout

    You get a layout drawing and a machine list: how many washers, dryers and stack units fit, where they sit, and where the service corridor and customer flow go. Stack dryers exist to double drying capacity without doubling floor area — that decision is made here.

    You get: a drawing showing every machine in position.

  3. 03

    Quotation

    Itemised, not a single number: machines, delivery, installation, commissioning, and what is excluded. If your site needs electrical upgrading or drainage works, we say so here rather than after the order.

    You get: a written quotation against a named site.

  4. 04

    Order & lead time

    As fast as 14 days for stocked models; allow up to 30 days for indent orders. Your confirmation fixes the schedule, and we tell you which of the two your mix falls into before you commit.

    You get: a delivery window, in writing.

  5. 05

    Delivery to site

    Coordinated with your fit-out contractor so machines arrive after the floor and power are ready, not before. Access and lifting are checked at survey stage, which is why step one matters.

    You provide: site access on the agreed day.

  6. 06

    Installation & commissioning

    Positioning, levelling, plumbing hook-up and full testing — by our own team, not a subcontractor. Every machine is run and checked before we hand it over. This is what the quotation calls "commissioned".

    You get: machines running, tested and ready for customers.

  7. 07

    Training, warranty & service

    Operator handover on running the room, hygiene standards and the IoT dashboard. Warranty runs per package: Pro Power 6 years — equivalent to 30,000 cycles — and Semi Pro Power 3 years — equivalent to 16,000 cycles. Service response is 24 hours, with spare parts and preventive maintenance available after the warranty period.

    You get: a trained operator and a service number.

What we need from you

Five things turn an enquiry into a quotation. If you have all of them, the process moves in days rather than weeks.

Floor area

Dimensions of the space, or a floor plan. Roughly 40 m² is the practical minimum for an unmanned room.

Power supply

Single-phase or three-phase, and the rating available. A single 15kg washer draws 21 kW.

Water & drainage

Where the inlet and the drainage points fall, or whether they need to be created.

Target opening

The date you are working towards, so the lead time can be checked against it before you order.

Start with a survey.

Send the space and the target date. We will tell you what fits, what it costs and how long it takes.